Permeable Concrete

Opie Contractors recently completed a the Rosedale Road to Rooks Place section of the Rosedale Road Cycleway which required a permeable concrete.  Research into the mix and design and development of construction methodology was achieved through multiple lay-down trials as well as building and developing tools and equipment to aid construction of the path.

A smooth, permeable concrete cycleway, well in excess of the permeability requirement (a flow rate of 100L of water per square meter of footpath per minute) was constructed.